What changed
In its June 2026 Notice to Operators, the RRC announced that effective September 1, 2026 it would no longer accept paper filings for Form P-18, Form PR, Form P-5, Form W-3C and Form W-3X. Paper submissions were accepted through August 2026; since September 1 the electronic channel is the only channel. The RRC's own Form PR FAQ now answers the question "can I still file on paper?" with a plain no.
The five forms and where each is filed now
| Form | What it is | Filed in |
|---|---|---|
| PR | Monthly Production Report - oil, gas, casinghead gas and condensate produced and disposed, by lease and district | RRC Online System - keyed in, or uploaded as an EDI file. Access requires a Security Administrator Designation (SAD) form on file for your organization. |
| P-18 | Skim Oil/Condensate Report (monthly) | LoneSTAR |
| P-5 | Organization Report - operator registration, annual renewal and financial assurance | LoneSTAR |
| W-3C | Certification of Surface Equipment Removal for an Inactive Well | LoneSTAR |
| W-3X | Application for an Extension of Deadline for Plugging an Inactive Well | LoneSTAR |
When Form PR is due
The RRC's Form PR instructions put the deadline at on or before the last day of the month following the month covered by the report. That means:
The deadline does not move for weekends, and it does not move because the paper channel closed. A report that used to be mailed on the 28th now has to be in RRC Online by the same last day of the month.
From the gauge to the filing
- Capture. The pumper photographs the tank gauge or the transporter's run ticket on the phone they already carry. WellSite reads the volume off the photo, stamps it with the well, time and location, and queues it against the lease.
- Validate. Production and dispositions are balanced by lease before anything reaches a form. The operator approves the month; nothing files without a human sign-off.
- Build. WellSite generates the Form PR as a schema-checked X12 867 EDI file for upload to RRC Online, and a populated Form PR replica for review or a wet signature. Every filing carries an audit record: what was filed, when, from which readings, approved by whom.
- Submit. You upload the file in RRC Online under your own SAD credentials. WellSite does not file on your behalf; it makes the file that passes.
Questions operators are asking
Does the RRC still accept paper Form PR?
No. Effective September 1, 2026 the RRC no longer accepts hard-copy filings of Form PR, along with P-18, P-5, W-3C and W-3X. Form PR is filed electronically in the RRC Online System, keyed in or uploaded as an EDI file.
When is Form PR due?
On or before the last day of the month following the month covered by the report. August production is due by September 30; September production by October 31.
Which forms went electronic-only?
P-18 (Skim Oil/Condensate Report), PR (Monthly Production Report), P-5 (Organization Report), W-3C (Certification of Surface Equipment Removal for an Inactive Well) and W-3X (Application for an Extension of Deadline for Plugging an Inactive Well).
Where is each form filed now?
Form PR in the RRC Online System (SAD form required). P-18, P-5, W-3C and W-3X in LoneSTAR (a Delegated Administrator is required for each company).
Can Form PR be uploaded as an EDI file?
Yes. RRC Online accepts Form PR as an EDI upload built to the RRC's Form PR EDI filing requirements. WellSite generates that file from your validated production records.
Does WellSite submit the report for me?
No. WellSite builds the filing - the EDI file or the populated form - and keeps the audit record. You submit it in RRC Online under your own credentials, so the operator of record stays the operator of record.
Seven-day free trial, priced by reporting district with unlimited wells - or open the demo workspace with sample data, no signup.
Sources
- Railroad Commission of Texas, Production Reporting Form PR FAQs - "effective September 1, 2026, the RRC will no longer accept any hard-copy (paper) filings".
- Railroad Commission of Texas, Form PR instructions - due "on or before the last day of the month following the month covered by the Form PR".
- Railroad Commission of Texas, Form PR EDI filing requirements.
- Beatty & Wozniak, Texas Railroad Commission to Eliminate Paper Filing for Key Oil and Gas Forms Beginning September 1, 2026 - summary of the June 2026 Notice to Operators, LoneSTAR and RRC Online requirements.
- Railroad Commission of Texas, Form P-18 (Skim Oil/Condensate Report) and Form W-3C.
This page is a plain-language summary for operators, not legal or regulatory advice. Filing obligations, deadlines and the accuracy of what is filed remain the responsibility of the operator of record. Check the RRC's own notices for the current rule text.